If the scab method of attachment is desired, Building Framers and/or Truss Fabricators are responsible for the following: Installation and attachment of the scab members to trusses occurring in the roof plane designed. .
The SR truss design drawings shall output the following on the drawing: Text containing the wording “Solar Ready” to indicate the truss has been designed SR. Truss chord label under the SR plane. Example “Chord A-E. .
It is intended that the identification of the home as being built Solar Ready according to NRCan’s Solar Ready Guidelines and the TPIC SR Truss Design Procedure will assure. .
Solar Ready (SR) roofs must be designed with the assumption that the roof may or may not have a solar system installed at some point throughout their life time. Therefore, SR roofs must.